The new revision arrived by email, and the site is still building from the old one.
Whatever was built from the withdrawn revision is torn down and redone, and the dispute with the client over the cost is only beginning.
- Folder Building B / Drawings
- Sent by the designer, by email 28 Aug
- Arhivix today
- Upload the new revision over the existing sheet (Replace): the earlier one stays in version history, and everyone opens the current one. Ping the site manager on the sheet, and they open it on site in the mobile app.
